Enabling
Works
Secure. Clear. Prepare.
Site preparation is the critical phase that transforms a raw plot into a workable construction environment. Neglecting this stage leads to costly delays.
LG Groundworks provides comprehensive enabling works across Surrey. We handle the logistics—from perimeter hoarding and secure haul roads to service disconnections—so the main contractors can hit the ground running.
HSE Compliance
CertifiedWaste Carrier
LicensedRisk Assessments
RAMS Provided
Enabling Services
Security & Hoarding
Securing the perimeter is step one. We supply and install:
- Timber Hoarding (inc. Painting)
- Heras Fencing
- Vehicular Gates
Clearance & Muck Away
Rapid removal of obstacles to reach reduced dig levels.
- Vegetation Strip
- Demolition & Soft Strip
- Grab Lorry Service
Access & Logistics
Ensuring heavy plant can move safely on site regardless of weather.
- Temporary Haul Roads
- Crane Pads (Hardstanding)
- Wheel Wash Facilities
Utilities & Welfare
Managing live services and site facilities.
- Service Disconnections
- Temporary Power Supplies
- Welfare Cabin Bases
Environmental
Protecting the surrounding ecosystem.
- Tree Protection (TPO)
- Root Protection Areas
- Dust Suppression
01. Survey
Site inspection to identify hazards, services, and ecology. Production of RAMS.
02. Secure
Immediate installation of hoarding or fencing to define boundaries.
03. Clear
Vegetation strip and disconnection of utilities to prepare for earthworks.
04. Access
Laying of haul roads and hardstanding for welfare units.
Common Questions
We ensure your site meets all legal and safety requirements before the build begins.
We strictly adhere to BS 5837:2012. We install robust root protection areas (RPAs) and protective fencing to ensure no heavy machinery compacts the soil near protected trees.
Yes. We coordinate with UKPN, Cadent, and water authorities to manage the safe disconnection and capping of gas, electricity, and water supplies.
For a standard residential development, perimeter security and initial welfare setup can typically be achieved within 3-5 days.