Skip to content
Surrey County Town

Groundworks in Guildford

We are your local A3-corridor engineers. Navigating the Gyratory, the River Wey floodplain, and the steep chalk of the Hog's Back with precision and speed.

10 Miles From Fetcham HQ
Guildford BC Planning Experts
100% Own Plant & Fleet
25+ Years Local Experience
Our Capabilities

Engineered for The Gap

Guildford sits in a geological "Gap" carved by the River Wey through the North Downs. This creates extreme variations in ground conditions, from the waterlogged silts of Millmead to the solid chalk of Merrow.

Geology

River Silt vs. Chalk Spine

If you are building in **Shalford, Millmead, or along the Wey**, you are likely dealing with Alluvium and River Terrace Deposits. These are soft, compressible soils with a very high water table, requiring deep piling and de-watering.

Conversely, properties on **The Mount, Pewley Hill, or Merrow** sit on the Chalk Spine. Here, the challenge is excavation hardness and steep gradients. We have the rock-breaking breakers and the slope-stabilization experience to handle both extremes.

Floodplain Piling

For riverside properties, we use displacement piling that doesn't bring up spoil (avoiding contamination issues) and anchors firmly below the soft silt layers.

Slope Stabilization

For The Mount and Onslow Village, we engineer reinforced retaining walls and terracing to create usable garden space on steep chalk inclines.

Drainage

River Wey Flood Defense

The River Wey is beautiful but prone to flooding. Guildford Borough Council enforces strict SUDS (Sustainable Drainage) compliance. We ensure your new build or extension is protected from the rising water levels associated with the town center.

01.

Non-Return Valves

Essential for properties in GU1 lowlands. These valves automatically close the sewer connection if the main sewer back-surges during a flood.

02.

Permeable Attenuation

We install large sub-surface crates under driveways in Burpham and Merrow to hold storm water and release it slowly, satisfying GBC planning conditions.

03.

Steep Gradient Drainage

On steep hills (Pewley/The Mount), rapid runoff can damage foundations. We install interceptor drains to catch and divert water before it hits the structure.

Planning Resources

Guildford Planning

Check constraints for Town Centre conservation areas and flood zones.

Visit Portal →

Environment Agency

View the official flood risk map for the River Wey and tributaries.

Check Postcode →

Thames Water

Developer services for build-over agreements and sewer connections.

Developer Services →

Frequently Asked Questions

Can you handle the Guildford Gyratory traffic? +
Yes. We know the one-way system is a logistical challenge. We schedule our grab lorries and plant deliveries outside of rush hour (7-9am / 4-6pm) to ensure we actually reach your site on time.
My property is on a steep hill (The Mount). +
We specialize in "sloping site" logistics. We use tracked dumpers that can safely navigate steep inclines and have experience creating terraced staging areas for piling rigs.
Do you work in the Town Centre Conservation Area? +
Yes. We are experienced with the heritage requirements of central Guildford (cobbled streets/historic brickwork). We can source reclaimed materials to ensure your groundworks match the existing aesthetic.
Are you approved for street works? +
Yes. If you need a dropped kerb or sewer connection in the road, our office handles the Section 50 license application with Surrey County Council Highways on your behalf.

Build on Solid Ground.

Get Your Free Quote