Demolition contractors in Surrey for soft strip, site clearance and crush-on-site recycling.
LG Groundworks provides demolition services for residential and commercial sites across Surrey, from early surveys and strip-out planning through to takedown, crushing, and cleared-site handover.
We own and operate our own demolition excavators and breakers, which gives tighter safety control and removes handoff delays. The page now ties demolition more clearly into the next works package, whether that is site preparation, earthworks, or new foundations.
Where demolition intent should route into LG Groundworks.
These service-area links connect demolition demand with local coverage pages, while the proof blocks make the page stronger for both commercial buyers and search engines.
Those are the questions decision-makers ask first, so they now help qualify the page earlier instead of being buried in the FAQ.
The page now speaks more directly to the full demolition journey, which improves relevance for demolition contractor and site-clearance searches.
Recycling and reuse give the page a stronger authority signal for developers and contractors looking for practical site recovery, not just removal.
Demolition Solutions
Structural Demolition
Total dismantling of residential houses, garages, and commercial outbuildings using heavy plant machinery.
Soft Strip
Removal of internal fixtures, fittings, and non-structural elements prior to refurbishment or full demolition.
Crushing & Recycling
We process concrete and brick arisings on-site using mobile crushers to produce 6F2 hardcore. This reduces waste costs and provides reusable material for the new build.
Hazardous Waste
Safe identification and removal of asbestos and other contaminated materials in line with HSE regulations.
01. Survey
Site assessment for risks, asbestos, and service disconnections. Production of RAMS.
02. Strip Out
Removal of internal waste and non-structural items to prepare the shell.
03. Demolish
Controlled mechanical demolition of the main structure using 13T-20T excavators.
04. Crush
Processing of rubble into hardcore and final site grading.
Demolition FAQs
In most cases, yes. You typically need to submit a Section 80 notice to the local building control 6 weeks before work begins. We can assist with this paperwork.
An asbestos survey is mandatory before any demolition. If found, we coordinate its safe removal by licensed specialists before we begin the structural takedown.
Yes, we grub out all existing foundations and footings. We can then crush this concrete to provide a piling mat or sub-base for your new build.
Useful next steps once the structure is cleared.
Demolition enquiries often lead directly into site preparation, earthworks, plant hire, and new foundation packages.
Clear the way for progress.
Contact Surrey's demolition experts for a free site visit.