Skip to content
London Civil Engineering

Groundworks in Wimbledon

We are your A3-corridor partners. Delivering complex basement retrofits and heavy civil engineering to SW19, fully compliant with Merton Council's strict CMS requirements.

12 Miles Via A3
Merton Planning Experts
100% Own Plant & Fleet
25+ Years London Experience
Our Capabilities

London Logistics Expertly Managed

Working in Wimbledon Village or "The Grid" requires military precision. We handle bay suspensions, Red Route licenses, and narrow residential access while keeping your neighbors happy.

Geology

The Hill vs. The Grid

SW19 has two distinct geological profiles. Wimbledon Hill and the Village sit on a cap of Bagshot Gravels and Sand. This drains well but requires shuttering or sheet piling during excavation to prevent collapse.

As you descend the hill towards South Wimbledon and The Grid (Southfields), you hit the impermeable London Clay. The boundary between these layers creates a "Spring Line" where groundwater naturally emerges. We design drainage specifically to intercept this flow around your basement shell.

Sheet Piling

Essential for the sandy soils of the Village. We use silent press piling methods to minimize vibration and noise for your neighbors.

Underpinning

For Victorian terraces in Raynes Park and South Wimbledon, we use traditional mass concrete underpinning to safely deepen foundations in clay.

Basements

Merton Basement Compliance

The London Borough of Merton is one of the strictest authorities on basement construction. They require a detailed Construction Method Statement (CMS) and a Basement Impact Assessment before ground is broken. We provide the full technical package.

01.

CMS & CMP

We draft the Construction Management Plans required to prove how we will handle spoil removal, traffic, and noise without disrupting the borough.

02.

Sump & Pump Systems

Dual-pump stations with battery backups are standard in our Wimbledon builds to manage groundwater surge in the spring-line zone.

03.

Conveyor Loading

For mid-terrace properties with no side access, we use high-speed conveyors to move spoil through the hallway directly to waiting grab lorries.

Planning Resources

Merton Planning

Search for applications and view basement guidance notes for SW19.

Visit Portal →

Wandsworth Planning

For properties in Southfields/Earlsfield borders falling under Wandsworth.

Visit Portal →

Parking Suspensions

Apply for skip licenses and parking bay suspensions for site access.

View Rules →

Frequently Asked Questions

How do you handle the Tennis Fortnight (AELTC)? +
We are well aware of the exclusion zones and heavy traffic restrictions during the Championships in late June/July. We schedule heavy deliveries and spoil removal outside of these dates to avoid site paralysis.
Do you cover parking bay suspensions? +
Yes. In Controlled Parking Zones (CPZ) like Wimbledon Village, we handle the application with the council to suspend bays for skips or grab lorries, ensuring the cost is factored into your quote.
Can you dig a basement under a terraced house? +
Yes, this is a core specialty. We use a "pin" underpinning method to support the party walls shared with neighbors, allowing us to excavate safely underneath the existing footprint.
Are you insured for London basements? +
Absolutely. We hold £10m Employers Liability and £5m Public Liability insurance, specifically covering deep excavation and underpinning work, which standard builder's insurance often excludes.

Build on Solid Ground.

Get Your Free Quote