A defined starting point for construction

We assess controlled demolition, garage and outbuilding removal, slab breakout and hardstanding clearance alongside the works that follow. The proposal should state exactly what is being removed, what is retained and the condition required for the next ground phase.

  • Small structural demolition
  • Garage and outbuilding removal
  • Slab and hardstanding breakout
  • Waste sorting and site clearance

Surveys and isolations before machinery

The structure, condition, nearby buildings, live services and available surveys shape the demolition method. Tell us about existing asbestos information, structural surveys, utility disconnections and any approval requirements. Missing information must be resolved through the appropriate competent specialists before the relevant work.

Protect the retained site

Access routes, neighbouring property, boundaries and retained features need deliberate protection. Dust, noise, working hours, segregation and loading arrangements belong in the site plan. Separate waste streams and defined collection routes help keep clearance controlled.

Connect clearance to the next phase

If excavation or foundations follow, agree whether old footings, below-ground obstructions and redundant drainage are part of the demolition scope. Clear exclusions make quotations comparable and reduce uncertainty at the handover.