From Horsell Common to the Basingstoke Canal. We deliver heavy civil engineering, piling, and basement construction to Woking's urban and residential sectors.

8 Miles From Fetcham HQ
Woking BC Planning Experts
100% Own Plant & Fleet
25+ Years Local Experience
Our Capabilities

Engineered for Woking

Woking's rapid urban regeneration requires a contractor who understands high-density sites and complex sandy geology. We own the machinery to deliver.

Piling in Woking Sand
Geology

Bagshot Sand & Urban Clay

Woking sits predominantly on the Bagshot Formation (Sand) and London Clay. The sandy soil near Horsell and Pyrford is free-draining but prone to trench collapse if not properly shored.

In the clay areas (Goldsworth Park), we encounter volume change potential. Standard strip footings often fail here. We specialize in heave-protected piling to ensure long-term stability.

Sand Solutions

Trench boxing and CFA piling to stabilize granular, shifting soils.

Clay Solutions

Anti-heave protection (Clayboard) installed beneath reinforced concrete slabs.

Canal Drainage Systems
Drainage

Canal & Water Table

Development near the Basingstoke Canal and the River Wey navigation requires careful water table management. High water tables in Woking can lead to hydrostatic pressure on basements.

We install Type B (Structural) and Type C (Cavity Drain) waterproofing systems. We also handle the complex drainage connections often required by Woking Borough Council to separate surface water from the foul sewer.

  • Dewatering: Managing groundwater during excavation in sandy soils.
  • Pump Stations: For basements situated below the main sewer line.
  • Flow Control: Hydro-brakes to manage discharge into the public network.

Woking Planning Resources

Woking Council

Planning applications and building control for GU21/GU22.

Planning Portal →

Urban Core Plan

Understanding the high-density development zones in Woking Town Center.

View Policy →

Thames Water

Sewer connection applications and build-over agreements.

Developer Services →

Frequently Asked Questions

Do you work on the private roads in Horsell and Pyrford? +
Yes. We are experienced in working on private estates. We respect resident associations' rules regarding noise, parking, and road cleanliness, ensuring our heavy plant does not damage private infrastructure.
Can you handle the high water table near the canal? +
Yes. We use well-point dewatering systems to temporarily lower the water table during excavation. We then install heavy-duty reinforced concrete rafts with water-bars to create a permanently dry watertight structure.
How do you manage traffic in Woking Town Center? +
Logistics in central Woking can be tight. We handle all Section 50 road licenses for hoarding and grab lorry access. We schedule deliveries to avoid peak commuter times, minimizing disruption to the busy road network.
Do you provide structural calculations? +
Yes. We work with our own structural engineers to provide the full package—Calcs, RC detailing, and Temporary Works designs—required to get your project through Building Control.

Build on Solid Ground.