Explore this page+

Connect levels and infrastructure

For a Reigate civil engineering enquiry, send the survey, building interfaces, drainage and external-works drawings together. The relationships between them determine the ground package. A road formation or service route should be considered against the levels and structures it will connect.

Separate design from construction responsibility

Explain which drawings are complete and which elements need further design, specialist input or approval. A responsibility schedule helps establish temporary works, setting out, testing and connection interfaces. Construction pricing should make those boundaries visible.

Plan phased access around the works

For an occupied or phased site, identify the routes and services that must remain available during each stage. Show proposed work areas and handover dates. Those constraints shape plant movements, storage and the timing of drainage or concrete operations.

Prepare a coordinated tender enquiry

Include the scope, specifications, drawing register, programme and available ground information. Add the required records and the condition expected by the following contractor. We can review substructures, drainage, excavation and external works support against the same set of project assumptions.