New builds and extensions
The ground package can be scoped from initial clearance to the completed substructure.
- Foundation excavation and concrete
- Ground beams and slab preparation
- Foul and surface-water drainage
- Reduced-level digs
- Site clearance and demolition support
- External levels and utility trenches
Protecting access and existing features
The logistics plan should address trees, retained landscaping, driveway loading, road cleanliness, neighbour access, and material storage before larger plant or lorries arrive.
- Tree and root protection areas
- Drive and gate capacity
- Plant selection
- Muck-away route
- Concrete pump position
- Temporary protection and cleaning
Treat retained landscaping as a constraint
Where mature trees and finished drives are being retained, include the arboricultural plan and protection boundaries with the access photographs. Machine access and spoil storage need to respect those project requirements. A route that is wide enough may still be unsuitable because of loading, turning or protected root areas.
Price the site, not just the drawing
Drawings define the intended work, while access, ground, water, services, and programme determine how it can be delivered. Both sets of information are needed for a useful proposal.
- Current drawing set
- Access measurements
- Ground or trial-pit information
- Existing service details
- Drainage strategy
- Programme and interfaces